500-Call Apartments/Schools Master Station (Model: XBW-500)

Functions and Features
★ XBW-500 master station can have up to 500 substations.
★ Easy installation: The master station and substations can be connected with only ten five-core cables.
★ Main functions:
● The master station has such functions as testing broken-down substation, anti-electromagnetic interference, lightning-proof etc.
● Master Station Chinese LCD display with menu operations; can display Time, Date, Calling Substation, System Status, etc.
● Duplex conversations between Master Station and Substations. Hands free operations or handset operation.
● Voice processing. When Substation calling, Master Station LCD indictor light flashes, short music tone sounds with audio announcement of calling Substation number.
● Master station loud alarm alert: When the sound of substation reaches certain decibel, the auto control room will alert.
● Master station broadcast function with music input interface. Timer can turn the unit on/off automatically and alert substations.
● Can display all alarms of substations and keep alarm status.
● Can circularly monitor each substation and corresponding substation can not know.
● Master station can talk to many substations (group call and all call).
● Level-2 and level-3 management function. One level-2 or level-3 master station can connect 10 level 1 master stations and 500 substations.
● Continuous alarm: Master station can receive alarms from substations and play corresponding voice prompts no matter the master station is in standby, talk, broadcast or circular monitor status.
● Alarm output port to connect alarm flash light.
● Alarm output port to connect alarm flash light.
● 485 communication interface


Installation and Operation
1. Hardwares
1) Speaker of master station
2) Microphone of handset
3) LCD
4) Power switch (POWER)
5) Broadcast/∨
6) Monitor/∧
7) Function key
8) Hand-free key (TALK)
9) Router floor switch
10) Router floor indicator light
11) Router substation switch
12) Router substation indicator light

2. Technical Parameters
供电电压:AC220±10% 、DC18V3A
纹波系数:5%
静态功耗:40W (VA)
工作状态功耗:60W (VA)
音频输出功率:2W THD 10%
喇叭阻抗:20Ω
音量调节范围:40dB
音频频率响应:100Hz - 10KHz
广播信号输入电平:1V
监听范围:30M²
控制信号方式:FSK
控制信号发射电平:10V - 18V
控制信号接收电平:>=10V
控制信号波特率:1200bps
话筒输入灵敏度:-44±1dB 全向
通话方式:手柄或免提
循环监听时间:每路5秒
呼叫分机方式:可单呼、组呼或群呼
广播状态功耗:300W [带500个分机时]
环境温度:-10℃---+80℃
工作温度:-5℃---+40℃
外接数据口: 232/485
外接数据口波特率:2400bps
Output power of master station: 800mW
Dimensions of master station: 305x210x75mm (LxWxH)
通讯距离(每条总线接满50个分机,含广播功能): 100m(0.5mm2); 150m(0.75mm2); 200m(1.0mm2)。 用0.75mm2的线,加中继盒最大可达到2000米。
 

 
3. Installation and Operation


 
1) Connecting power
Connect the DC18V transformer (included, no polarity) to +/- connectors on the rear of the master station correctly. Depress the power switch. Year, month, day and time will display on the LCD. The power is in normal working status.
2) Testing master station and substation
Testing master station: Depress the power switch on the panel of master station after connecting it to power source. The master station will start self test and test each substation one by one from No. 1 substation. Corresponding indictor light will flash one if the tested substation is in normal working status. And the indicator light will lighten and keep in bright green if otherwise. After testing all substations, the bright green indicator light will go out after five seconds. The master station will return to normal status automatically after testing.
3) Alarm and talk
Corresponding router indicator light of the master station will flash in red if a substation is calling. And calling substation number will display on the LCD, music prompt will sound and the system will broadcast calling number. You can talk to the calling substation by depressing corresponding router switch on the master station, picking up microphone and substation. (Note: Master station can talk by depressing the hands free key; Master station can listen by releasing the hands free key. Talk from master station can be heard by substations after 0.5 second by using hands free key for the first time.)
4) Monitor and circular monitor
Monitor: Depress the router switch on the panel of master station to monitor corresponding substation. Eject the router switch to cancel.
Circular monitor: Depress the monitor switch of master station in standby status for two seconds to monitor substations circularly (each substation will be monitored for five seconds). Depress the monitor switch again for two seconds to cancel circular monitor.
5) Group call, all call
Group call:
Select No.1-5 substations by picking up handset and depressing No. 1 router switch of master station for two seconds. Corresponding indicator lights will lighten in green. The master station can talk to all selected substations with handset at this time. Depress the No. 1 router switch of master station for two seconds again to cancel.
Select No.6-10 substations by picking up handset and depressing No. 6 router switch of master station for two seconds; select No.11-15 substations by picking up handset and depressing No. 11 router switch of master station for two seconds (by analogy). Follow above method to cancel.
All call:
Press the broadcast key on the master station to select all substations. The master station can talk and broadcast to all substations by picking up handset or depressing hands free key.
6) Broadcast function
Audio signal can be input from MUSIC input port on the rear of master station.
Depress the broadcast key. All router indicator lights of substations will lighten in green. The master station can broadcast or play background music at this time. “Broadcast status…” will display on the LCD of master station. Corresponding indicator light will lighten in red green if a substation is calling. And voice prompt of corresponding substation number will sound.
7) Alarm output
The connectors (ARM+, 5) on the rear of master station are alarm output port. Alarm flash light or speaker can be connected to the alarm out put port. The alarm of substation will touch off alarm flash light or speaker if corresponding router switch on the master station has not been selected.
 
Notes:
1) Contractors or Installers have the option to preset system expiration date to ensure collection of payments.
2) Monitor can not be found by substations.
3) When powered on, if the master station can not select any substation, check each grounding wire (No. 5 wire) of each substation connected on the cable. If any grounding wire has nor been connected correctly, above malfunction will happen.

This product is supplied by Shenzhen LonBon Technology Co., Ltd. For more information, please visit: www.lonbon.com/doce/L1-3.htm